05/07/2024
KISC technical transformation project has been put into production!
With the switching of the flue valve, the flue gas entered the desulfurization system. The ultra-low emission technical transformation project of the flue gas from the steel rolling heating furnace of KISC officially entered the trial production stage and successfully put the entire line into production.
02/07/2024
Recently, Jianlong Beiman Special Steel has officially shipped more than 600 tons of ultra-low sulfur corrosion-resistant oil and gas field pipeline steel produced in batches for the first time to customers.
26/03/2024
The heat load test run of the ammonia desulfurization system of the 1# blast furnace hot blast furnace in KISC New District was a complete success!
22/03/2024
The LF Furnace Intelligent Control Smelting Model Developed by Ansteel has been Put Into Use
The LF furnace intelligent control smelting model developed by Ansteel has been put into use.
Timely Info | Independent | Platform | Multiple guarantees | Self-operated storage |
About us | Channel | Useful tools |
---|---|---|
About China Steel Market | Prices | Steel weight calculation |
Contact us | Answers | |
Terms & Conditions | Inventory | |
Privacy Policy | Help |
Hot search words: